Avition Department

Tri-dimensional structures


Hygrometric Controlled Shelters & Clear Span Structures

Fast Erecting Shelters & Domes

 

Fast Erecting Shelters & Domes

 

Fast Erecting Shelters & Domes

Fast Erecting Shelters & Domes

Fast Erecting Shelters
Those shelters are on a trailer with hydraulic self assembly system. This assembly system is an ultra rapid system (1person in 15 minutes for the 60sqm shelter).
Climatic resistance:

  •   snow: 10 daN/m2
  •   wind: 120 km/h

The main applications are:
For 60 sqm: tents used by the Fire Brigades, Civil Security; or mobile hospitals or computer rooms.
For 120 sqm: mobile maintenance Centers for all type of vehicles or small helicopters; computer logistic Centers; or room for relaxation and meetings.
For 250 sqm: gardens for aircraft; briefing rooms; or large scale workshops.
For 340 sqm:  garages for heavy-lift helicopters: large scale workshops; reception and conference rooms; gymnasium;  or refectory.

Technical Specifications

Material range

FEFS 60

FEFS 120

FEFS 250

FEFS 340

Dimensions (L x W x H in m)

Shelter size 9 x 9 x 2.6
Trailer size 5 x 1.8 x 2.5

Shelter size 12 x 2.4 x 5.5
Trailer size 6 x 2.4 x 2.8

Shelter size 18 x 18 x 2.6
Trailer size 9.4 x 2.4 x 3.75

Shelter size 21 x 21 x 6
Trailer size 13.5 x 2.48 x 4

Weight of shelter + trailer

2500 kg

4600 kg

10700 kg

16000 kg

Standards number of arches: 7

Options
Heating// air conditioning// ground carpet and deshumidificator equipments // inflatable tent connected to the shelter

Domes
Our Domes are metallic textile shelters half-spherical with a rapid opening mechanism.

They are used as Radar Covers or missiles launcher covers.
Climatic resistance:

  •   wind: 204 km/h
  •   snow: 110 daN/m2

Technical Specifications


Material range

9 m Dome

11 m Dome

13 m Dome

15 m Dome

Dimensions:
Ground circle
Diameter x height

9 m x 5 m

11 m x 6 m

13 m x 7 m

15 m x 8 m

Volume

12 m3

16 m3

22 m3

30 m3

Weight

2840 kg

4100 kg

5700 kg

7500 kg

Standards
Security straps linking arches to each other // manual opening in emergency // normal opening time: 30 seconds // instant opening in case of strict necessity

Options
Air conditioning// dry air // lighting

System in process of deployment from its truck platform

Erection hydraulically operated

Open dome

Closed dome

Top

 

Copyright©Machinery Sales Corporation 2007